This energy renovation consisted of insulating the buildings of the Town Hall, Communal Kindergarten and Primary School.
Inside renovation was also carried out on the reception area, offices, and canteen. The main walls of the Town Hall and the School were insulated from inside in order to preserve the character and overall appearance of the buildings; other façades were insulated from the outside.
The reception area was rendered more welcoming with a glass canopy awning over the front door, lighting up of the facades of character, and better accessibility for people of reduced mobility (wide access ramp and stairs, handrails).