La Tronche - 38


School “La Carronnerie”

Mission exercée
Entire mission
Client
Commune de La Tronche
Surfaces
2 565 m² (SHON)
Coût des travaux
160 000 € H.T.
Année
2016
Cible énergétique
-
Statut
Completed

Overall Objective

Compliance of the school “La Carronnerie” at La Tronche, with the regulation concerning accessibility for people of reduced mobility.

Description

To allow the school to comply with regulations concerning accessibility for people of reduced mobility, a compliant elevator, two ramps and 3 toilets for disabled persons were installed.

The elevator shaft comprises 5 panels of reinforced concrete. Trapezoid-shaped apertures give a modern touch to the façade of the elevator shaft and, on its northern side, glass canopy awnings over the doors serve to protect from the rain without obstructing light.